Coal Mineral Processing Laboratory (CMPL) NBK Mining Institute
The Coal Mineral Processing Laboratory (CPML) at UBC was originally built in 1984. That building was renovated and upgrade in 2011 at a cost of 5,500,000. Designed by Johnson Davidson Architecture, the exterior of the 6,500 sqft building now boasts shimmering zincshingled tiles that represent one of the primary minerals mined by Teck ...